In high-rise residential buildings, fire safety is not optional — it’s critical. So when we were contracted to replace fire doors in a London tower block, our team at Mr. Flood Ltd took the call with the urgency and care the situation demanded.


What was expected to be a routine fire door upgrade soon revealed a serious health and safety breach: the majority of the metal fixtures and door components had been stolen, leaving residents dangerously exposed in the event of a fire.


With no delay, Mr. Flood and his trusted team were on-site within hours to assess the situation and take action. We supplied and installed fully compliant, high-quality fire doors throughout the affected areas of the building, working swiftly and safely to minimise disruption and ensure total compliance with fire safety regulations.


The entire job was carried out to the highest standard and signed off professionally, providing residents and building management with peace of mind that they are once again protected as they should be.


At Mr. Flood Ltd, we don’t just meet expectations — we respond when it matters most.


Have no fear, Mr. Flood is here.




Comments


24/7 emergency call-outLondon · Surrey · KentEmail our team

Available 24/7Emergency call-out · Speak to a specialist

Find a service or answer
Home

Projects

Fire-door replacement in a London block

Originally published 2025-04-19.

Fire-door replacement in a London block — illustrative restoration scene
Service illustration

The situation

A London tower block required replacement fire-door work after shortcomings in the existing installation were identified. Missing or unsuitable components were part of the concern recorded in the original story.

The response

The account describes supplying and installing replacement doors and associated components. The useful record is the specification and installation work undertaken; this article does not substitute for the relevant inspection, installation or handover documentation.

What to consider

Fire-door performance depends on the complete assembly, including frame, hardware, seals and installation details. Work should follow the appropriate specification and manufacturer instructions, with checks and records suited to the building and the agreed scope.

From the original project

Original project film 1. Poster: service illustration. Open film directly. Captions and a transcript have not been verified.

This is a summary of a previously published project, not a new completion report. Service illustrations are separate from the original project films.

Amy · Mr FloodFind your service

Need help choosing a service? Browse all services or email the Mr Flood team.

bottom of page